Same engineering. Different problem to solve.
A civil contractor needs a staging set that survives a programme change. An architect needs a parking layout that survives council. A council needs an audit it can defend. Sightline works across all of them — five tiles linking through to the pages below.
Civil contractors
Your programme doesn't wait for a redrawn plan.
Read the page →SectorDevelopers & architects
Council asked for a traffic report. We'll tell you which one.
Read the page →SectorGovernment & council
An independent check, from engineers with no stake in the outcome.
Read the page →SectorUtilities
Fifty small jobs is not one big job.
Read the page →SectorEvents
Road closed, crowd moving, police satisfied.
Read the page →A consistent way to define the right input
From enquiry to controlled issue- Step 01Send the project
Provide the site, available drawings and the issue that needs resolving.
- Step 02Confirm the scope
We identify the required assessment, documentation, programme and fee.
- Step 03Assess and coordinate
The technical work is developed against the project and authority requirements.
- Step 04Check and issue
The agreed review is completed before controlled issue and support through comments.
Send us the drawings. We'll tell you what you need.
2. Plans, if they exist
3. A description of the works
plans@sightlinetraffic.com.au
Suite 413, 388 George St, Sydney NSW 2000
Mon–Fri, 8am–5pm
ABN 16 699 960 668