Independent traffic engineering consultancy

Designed for approval.
Built for construction.

Sightline provides traffic engineering for development approvals, parking and access, network performance and construction delivery across NSW and the ACT. We prepare the reports, assessments and drawings that help projects move from concept and consent through to construction.

From traffic impact assessments and parking design to swept-path analysis, network modelling and construction traffic planning, Sightline provides practical engineering that supports the full project lifecycle.

Request a fee proposalView our services
Send the drawings — a written scope comes back with a fixed fee.
ABG-A224-S2 Overall - page 01 / 04
Drag or scroll
ABG-A224-S2 authorised overall corridor plan, page 1 of 4
Issued forApproval
Overall
ProjectABG-A224
Drawing statusIssued for approval
Drawing titleOverall plan - full corridor
Page01/04
300+

Schemes implemented alongside delivery teams

NSW + ACT

The jurisdictions we design for and secure approvals in

100%

Of documents through an internal design check before they are issued

1 day

To a fixed written fee for standard enquiries

Qualified traffic engineersTfNSW-aligned documentationAS 1742.3 · AS 2890 series · TfNSW TS 05492 · Current Austroads guidance
SHT 01

Why Sightline

Checked before issue

Anyone can draw a plan. Fewer can defend it.

TGSs, barrier layouts, swept-path analyses and capacity assessments are controlled technical deliverables. Each must be prepared and reviewed to the requirements applicable to the site, authority and project.

Engineered, not templated.

Every scheme is designed to the site — geometry, sightlines, volumes, staging — not adapted from the last job that looked similar.

Checked before it is issued.

Barrier deflection zones assessed against the manufacturer's specification and the road authority's requirements. Swept paths reconfirmed at each stage rather than carried forward on assumption.

Temporary barrier design →

Held together across stages.

Multi-stage projects get one coherent framework — staging, barriers, swept paths and network impact designed together, with revision history tracked sheet by sheet.

Resolving these questions at design stage generally costs a fraction of addressing them after construction, or after a request for further information.

SHT 02

What we do

Four engineering practices. One project lifecycle.
Supporting

Approvals and delivery support

Where required, Sightline can coordinate the approvals that accompany the engineering work, including road occupancy licences, council permits, stakeholder submissions and community notifications.

View approvals support →
SHT 03

The condition decoder

FreeSame business day

Not sure what your condition is asking for? Paste it. We'll tell you.

Many enquiries start with a condition of consent nobody can parse. Send the wording and a traffic engineer will reply the same business day with what it appears to require — and, just as usefully, what it does not.

Conditions rarely name a single document. The same clause can point to a construction traffic management plan, a traffic guidance scheme, or both, and ordering the wrong one costs weeks. We read the wording against the consent authority's requirements and set out the shortest compliant path.

What you sendThe condition wording, the site address, and anything council attached to it
What you get backThe document or documents the condition appears to call for, what each covers, and a fixed fee if you want us to prepare them
What it costsNothing — no fee, no obligation, no hourly surprises later
  1. 01Paste condition
  2. 02Engineer reviews
  3. 03Written reply
SHT 04

Who we work with

Same engineering. Different problem to solve.
Start here

Send us the drawings. We'll tell you what you need.


What to send
1. Site address
2. Architectural or civil plans
3. A description of the works
Sightline Traffic EngineersContact
1800 008 782
plans@sightlinetraffic.com.au
Suite 413, 388 George St, Sydney NSW 2000
Mon–Fri, 8am–5pm
ABN 16 699 960 668