Traffic impact assessment (TIA)

Bigger project, bigger scrutiny.

A Traffic Impact Assessment is the detailed evaluation council or a road authority requires for larger, more complex developments — a full technical case that your project's impact on the existing and future transport network has been properly tested, not assumed. Depending on the jurisdiction, you might see this called a TIA, TIAR, or TER. The terminology varies, and the required scope should be confirmed against the consent authority's requirements.

What we assess

  • Traffic generation & distributionvolume generated and how it disperses through the network

  • Vehicle access & egressdesign and safety of entry and exit points, including ramps

  • Car parking provision & designadequacy of on-site parking and AS 2890 / local planning compliance

  • Safetyconflict points, visibility, pedestrian risk

  • Sustainable transportpublic transport access, bicycle parking, end-of-trip facilities

  • Waste & loadingsafe, efficient collection and delivery operations

When you'll need one

Typically triggered where a development will generate significant additional traffic volume, alter access arrangements or create new intersections, affect on-street or off-street parking availability, or impact the safety or efficiency of the surrounding network. Common examples: large shopping centres, major residential subdivisions, hospitals, large schools, and any project requiring new signals or road upgrades.

FAQ

Common questions

How is this different from a TIS?

Depth and scale — full network analysis, intersection modelling such as SIDRA, traffic surveys, and future growth scenarios, versus a shorter statement of effect.

Does council always call it a “TIA”?

Core assessment themes are generally similar, but terminology, modelling requirements, assessment horizons and reporting expectations vary by authority and project.

What's in the final report?

Existing conditions, the development proposal, traffic generation and distribution analysis (modelled where relevant), parking and access evaluation, sustainable transport considerations, safety analysis, and final recommendations.

Development traffic engineering

Send us the drawings. We'll tell you what you need.


What to send
1. Site address
2. Plans, if they exist
3. A description of the works
Sightline Traffic EngineersContact
1800 008 782
plans@sightlinetraffic.com.au
9 Epic Pl, Villawood NSW
Mon–Fri, 8am–5pm
ABN 16 699 960 668